Blenheim Palace: ‘The Lake Dredge’

Services

Overview

Blenheim Palace are currently undertaking ‘The Lake Dredge’ as the Queen Pool has become seriously silted, which is threatening its delicate ecosystem. To manage this, in April 2022, they began their first dredge of the pool in over 100 years, removing enough silt over nine months to fill Wembley Stadium to the top!

Due to this, a surrounding footpath is closed, and Blenheim Palace wanted to explain what was going on to visitors, once they reached the large fenced off enclosure.

We enlisted the support JD Hoardings who bought a 26-tonne lorry down the narrow track leading to the compound and craned huge concrete blocks into place to support the hoarding.

The uneven ground meant that the hoarding undulated up and down, so our MacroArt team carefully measured the drops between each panel and amended the artwork to suit, ensuring the final artwork flowed across the entire length of the hoarding.

Our Projects

TK Maxx Hoardings

Oval Cricket Gasometer

HOW CAN WE HELP?

We would love to support you with your next project

Get in touch
call 01767 677946